Control technology

Test facilities in accordance with EN 12589: control tolerance; control response; pressure loss; characteristics for various upstream conditions; master-slave, etc.

Other possible measurements:

• Leakage test according to EN 1751 (dampers, housings). A test rig has been set up in the Anholt plant for leakage testing in accordance with EN 1751. Part of our series production is tested here.
• Testing of mixing boxes (e.g. degree of mixing efficiency)
• Testing of decentralised ventilation units (volume flow rates; suction / pressure characteristics, etc. according to VDMA 24390)

Del siden

Anbefal denne siden

Anbefal denne siden ved å sende en link pr. mail

Alle felter merket med (*) må fylles ut.

Del siden

Takk for din anbefaling!

Din anbefaling har blitt sendt og bør ankomme snart.


kontakt

Vi er her for deg

Visual contact Visual contact

Vennligst spesifiser din melding og type henvendelse

(*) Påkrevet felt

Kontakt

Takk for at du kontaktet oss!

Visual contact Visual contact

Henvendelsen blir behandlet snarlig.
For generelle henvendelser kan du også ringe: 61 31 35 30


kontakt

Vi er her for deg

Visual contact Visual contact

Vennligst spesifiser din melding og type henvendelse

Vedlegg (maks 10MB)

(*) Påkrevet felt

Kontakt

Takk for at du kontaktet oss!

Visual contact Visual contact

Henvendelsen blir behandlet snarlig.
For generelle henvendelser kan du også ringe: 61 31 35 30